Marsch 1 Сomposite Mesh

What is Composite Mesh?

The mesh is designed to reinforce concrete instead of traditional metal reinforcing mesh. It has significant advantages over metal:


  • 9 times lighter
  • 3 times stronger at break
  • 25% cheaper
  • Corrosion-resistant
  • Significantly speeds up the reinforcement process (no need to fix at the construction site)
  • No need to put bar chair spacers forming a protective layer of concrete
  • Low thermal conductivity
  • Dielectricity


The MARSCH 1 composite mesh is manufactured in cards measuring 2200x6000 mm,

with the possibility of producing cards of any size with a width not exceeding 2400 mm

and a length of no more than 12000 mm. The standard diameters of the rod from which

the mesh is made are listed in the sizes table. According to the customer's request, a grid

with intermediate dimensions can be manufactured.


Application Area


Up to now, the MARSCH 1 composite mesh has revealed the following limitations: low

heat resistance (up to 150°C), low modulus of elasticity. Considering these limitations,

we do not recommend using the MARSCH 1 mesh for reinforcing structures that must meet

special fire requirements: building intermediate concrete slabs, bridge columns,

monolythic structures pylons over 3 floors.


With these exceptions it is recommended to use the MARSCH 1 mesh in a wide range of

constructions:

  • decking of bridges
  • foundations
  • concrete roads
  • bank protection
  • concrete floors
  • concrete chemical storages
  • reinforced concrete products
  • monolyth up to 3 floors
  • concrete baths
  • swimming pools
  • fountain bowls
  • squares
  • wells
  • sewage treatment facilities
  • road plates
  • piers
  • port facilities
  • foundation grills
  • underground parking lots
  • helipads
  • concrete parking lots
  • access constructions


MARSCH1 Production line

Additional Information

The production line is used for production of composite rods with sand coating providing for a better bond to concrete. Approved by п30-18-30 pavement slab test reports. The products comply with GOST.   

- Capacity m/min 

Diameter 4 10 linear meters/min

Diameter 6 9 linear meters /min

Diameter 8 8 linear meters /min

Diameter 10 5 linear meters /min

- Quantity of simultaneously produced rods (pcs)

4 rods

- Minimum shopfloor dimensions for equipment installation (meters)

Length 25 m

Width 4 m

Height 2 m

*Smaller sizes are available upon request.

*Additional area is required for storage of raw materials and finished products.

- Required temperature for equipment operation (°C)

18-27 

- Full power of equipment (kW)

14 kW max

- equipment operating modes, idle periods (h/day)

23 h/day (1 hour for routine maintenance)

- Required number of operators (workers/shift) 

2 workers

- Competitive advantages

Sand coating on the rods.

Easy servicing

High capacity

Stable furnace parameters 

Raw material consumption for production of fiberglass reinforcements of most popular diameters

For 1 linear kilometer of АКС 4: 

19.2 kg of direct single-end roving

3.3 kg of 20 or similar epoxy resin

2.9 kg of isomethyl tetrahydrophthalic anhydride hardener

For 1 linear kilometer of АКС 6: 

34 kg of direct single-end roving

7.5 kg of 20 or similar epoxy resin

6.5 kg of isomethyl tetrahydrophthalic anhydride hardener

For 1 linear kilometer of АКС 8: 

57.7 kg of direct single-end roving

10 kg of 20 or similar epoxy resin

8.6 kg of isomethyl tetrahydrophthalic anhydride hardener

For 1 linear kilometer of АКС 10: 

105.6 kg of direct single-end roving

19.2 kg of 20 or similar epoxy resin

16.1 kg of isomethyl tetrahydrophthalic anhydride hardener

For 1 linear kilometer of АКС 12: 

150 kg of direct single-end roving

28.2 kg of 20 or similar epoxy resin

23.2 kg of isomethyl tetrahydrophthalic anhydride hardener





MARSCH1 specifications

  • The line produces reinforcements in four flows  Capacity up to 5 km per 12-hour shift for 8 m diameter
  • Operated by two workers min.
  • Easy servicing
  • Power consumption – 14kWh 
  • Produced diameters - f2mm - f18mm
  • Production period: 30 days
  • Warranty  1 year


Additional requirements:1. Ventilation system, 3-phase electric circuit, ground loop.2. Heated shopfloor ( +20°C) min, length – 25m, width - 4 m min. 


Payment terms: 70% advance payment, 30% when the production line is ready to shipment.

  1. Payment method: wire


Equipment production period:25-30 calendar days after advance payment. Equipment transportation, travel and accommodation cost shall be paid additionally by the buyer 

Contact Us

MARSCH1 MESH 2.0 Production line

Additional Information

  

Scope of Supply

 

Rod bin: 4

Transverse rod feed and cut off unit: 1

Rod thermal bonding unit: 1

Thermoplastic feed hopper: 1

Injection nozzle: 15

Mould for 4 mm diameter: 15

Mould for 6 mm diameter: 15

Mould for 8 mm diameter: 15

Mould for 10 mm diameter: 15

Pull unit: 1

Cut-off unit: 1

Table for finished cards: 1

Industrial compessor: 1

Water treatment system: 1

SPTA kit: 1

Production process (document package): 1

Passport: 1

Installation, commissioning, and training for 2 operators: 1

MARSCH1 specifications

  • The production line is used for making mesh consisting of ready composite rods
  • Capacity – up to 3m 2 /min.
  • Mesh width – 0.5 – 2.4 m.
  • Diameters - 4, 6,8,10 mm
  • Cell - 150, 200 mm
  • Operated by two workers min.
  • Easy servicing
  • Production period: 150 days
  • Warranty 1 year


Additional requirements:

1. Ventilation system, 3-phase electric circuit, ground loop.

2. Heated shopfloor ( +20°C) min, length – 25m, width - 6 m min.


Payment terms: 70% advance payment, 30% when the production line is ready to shipment.


Payment method: wire


Equipment production period:

150 calendar days after advance payment. Equipment transportation, travel and accommodation cost shall be paid

additionally by the buyer.

Contact us

Contact Us

Contact Us

We love our customers, so feel free to visit during normal business hours.

RES Trade GmbH

Hours

Open today

09:00 – 17:00

Drop us a line!

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Copyright © 2023 RES Trade GmbH - All Rights Reserved.

Powered by RES Trade GmbH

  • Immo Project
  • Recycling Project
  • Marsch1
  • GW2PP
  • EIDC